College Township, Centre County
This project involved rehabilitating 1.37 miles of existing Puddintown Road and 1.30 miles of Houserville Road.
The scope of work on Puddintown Road included replacing drainage facilities, guiderail replacement and adjustments, total reconstruction of the Lenor Drive intersection to correct sight distance, waterline relocation, Cold In-Place Asphalt Pavement rehabilitation, and asphalt overlay.
The scope of work on Houserville Road included replacing drainage facilities, guiderail replacement and adjustments, replacement of 42”x72” CMP near intersection with SR 26, waterline relocation, and asphalt overlay. Also included was the reconfiguration of the SR 26 southbound to westbound Houserville Road movement to remove the high-speed fly lane to facilitate a future shared use path in this quadrant of the intersection.
Utility involvement on this project included:
We have teamed with Keller Engineers on several design-build projects for PennDOT. When selecting a designer, the more critical factors are trust and competence, more so than a low price. If your designer makes a mistake in quantities it can cost you a lot of money. We have stayed with Keller Engineers because we trust them to provide competent service at a competitive price. S. Scott Grannas, Vice President Grannas Bros. Stone & Asphalt Co., Inc.