College Township, Centre County
This project involved rehabilitating 1.37 miles of existing Puddintown Road and 1.30 miles of Houserville Road.
The scope of work on Puddintown Road included replacing drainage facilities, guiderail replacement and adjustments, total reconstruction of the Lenor Drive intersection to correct sight distance, waterline relocation, Cold In-Place Asphalt Pavement rehabilitation, and asphalt overlay.
The scope of work on Houserville Road included replacing drainage facilities, guiderail replacement and adjustments, replacement of 42”x72” CMP near intersection with SR 26, waterline relocation, and asphalt overlay. Also included was the reconfiguration of the SR 26 southbound to westbound Houserville Road movement to remove the high-speed fly lane to facilitate a future shared use path in this quadrant of the intersection.
Utility involvement on this project included:
We have worked with Keller Engineers for structural and civil engineering support on six projects over the past five years and have been very pleased with the results. Our projects tend to be complicated phased renovation/ addition projects calling for creativity in planning and construction. I have been particularity pleased with their responsiveness to issues that arise during construction which is of particular importance to us and our clients. Vern L. McKissick, III, AIA, LEED AP, Owner/Architect McKissick Associates