Blair Township Water and Sewer Authority, Blair County
This project included the replacement of 2,800 LF of 8” PVC wastewater main, manholes, laterals, observation ports, and vents/cleanouts/traps; as well as the replacement of 96 mobile home laterals and reconnections, connection to existing wastewater system, related appurtenances and restoration. Keller Engineers’ team provided survey, design, bid process, and construction inspection/oversight.
We are very proud of our new office addition. Keller Engineers provided excellent guidance and support throughout our building project, which included key elements such as: structural recommendations, land development, environmental planning, and a beautiful rain garden. We knew we could trust the expertise of Adam Long, RLA and Brian Smith, PE in helping us create a practical and beautiful building and streetscape that enhances our neighborhood and the community. Dr. Alice Plummer Joyce, Altoona Dermatology Associates