Greendown Acres Mobile Home Park Wastewater System

Responsibilities

  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Design of Wastewater Collection and Pumping Facilities
  • Replacing 96 mobile home laterals and reconnections
  • Infiltration/Inflow Analysis
  • Observation Ports
  • Permitting
  • Bidding Services
  • Construction Inspection and Management
  • Grant and Funding Applications

Owner

Blair Township Water and Sewer Authority, Blair County

Project Details

This project included the replacement of 2,800 LF of 8” PVC wastewater main, manholes, laterals, observation ports, and vents/cleanouts/traps; as well as the replacement of 96 mobile home laterals and reconnections, connection to existing wastewater system, related appurtenances and restoration. Keller Engineers’ team provided survey, design, bid process, and construction inspection/oversight.

Photos

We are very proud of our new office addition. Keller Engineers provided excellent guidance and support throughout our building project, which included key elements such as: structural recommendations, land development, environmental planning, and a beautiful rain garden. We knew we could trust the expertise of Adam Long, RLA and Brian Smith, PE in helping us create a practical and beautiful building and streetscape that enhances our neighborhood and the community. Dr. Alice Plummer Joyce, Altoona Dermatology Associates