Redevelopment Authority of Somerset County, Somerset County
This project consisted of the design and installation of a wastewater collection system and pump station. The project was funded and supported by the Redevelopment Authority of Somerset County and was turned over to the Meyersdale Municipal Authority.
This section of the Township did not have a public wastewater system and was designated as an area of need. The new collection system included nearly 3,600 feet of 8” wastewater main, 900’ of force main, 22 lateral taps, railroad and stream bores and a pump station. The pump station delivers sewage across the Castleman River directly to one of the Meyersdale Municipal Authority’s pump stations.
Keller Engineers was responsible for survey, permitting, design, construction drawings and specifications, bidding, easement coordination, construction management (including monthly on-site job conferences) final inspection, and as-built drawings. Daily inspections were performed by the Somerset County Redevelopment Authority.
Project Uniqueness/Challenges: Coordination between the County Redevelopment Authority (funding agency) and the Meyersdale Municipal Authority (who is managing the completed system) was necessary.
The Meyersdale Municipal Authority requested we install a gravity system rather than a low-pressure system, which would result in all customers having an individual grinder pump. The Redevelopment Authority accommodated the request and secured funding for the addition to the project.
[Brian Moore] has kept me informed every step of the way on the front lines of this project. With this being my first project and me still being on a huge learning curve, that speaks volumes about Keller Engineers and Brian’s commitment to your customers. Chuck Case, Manager Falls Creek Borough, Jefferson County