Jackson East Taylor Sewer Authority, Cambria County
Wastewater Extension: This project involved construction of approximately 19,500 LF of 8” and 6” PVC wastewater main and 2,716 LF of 4” PVC force main, manholes, related appurtenances, and restoration.
The Pump Station project included the construction of two new pump stations, reconstruction of the existing Pump Station #12, and replacement of pumps at the existing Pump Stations #3 and #7, along with related appurtenances and restoration. The information will be entered into the Authority’s existing GIS system.
Municipal Building: This project included demolition of the existing office, utility relocation, a new 1,400 SF office building, design of an ADA concrete sidewalk and parking lot, new signage and two defined entrance/exit locations onto the state road.
[The] entire staff did a wonderful job! We truly appreciate all the hard work in making our bridge project a success and something we can be very proud to have in our township. Bev Sherwood Burns, Supervisor Blacklick Township