Jackson East Taylor Sewer Authority, Cambria County
Wastewater Extension: This project involved construction of approximately 19,500 LF of 8” and 6” PVC wastewater main and 2,716 LF of 4” PVC force main, manholes, related appurtenances, and restoration.
The Pump Station project included the construction of two new pump stations, reconstruction of the existing Pump Station #12, and replacement of pumps at the existing Pump Stations #3 and #7, along with related appurtenances and restoration. The information will be entered into the Authority’s existing GIS system.
Municipal Building: This project included demolition of the existing office, utility relocation, a new 1,400 SF office building, design of an ADA concrete sidewalk and parking lot, new signage and two defined entrance/exit locations onto the state road.
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District