Red Mill Water and Wastewater System

Responsibilities

  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Design of Water Treatment and Pumping Facilities
  • Design of Storage, Distribution, and Transmission
  • Rate and Tap Fee Analysis
  • Permitting
  • Construction Inspection and Management
  • Grant and Funding Applications
  • Design of Wastewater Collection and Pumping Facilities
  • Bidding Services
  • Act 537 Plans

Owner

Falls Creek Borough Municipal Authority, Jefferson County

Project Details

This project included the design of a 22,000 LF water system expansion, a 19,000 LF wastewater extension, water storage facility, booster pumping facilities, water treatment plant modification, a computerized treatment process control system, and related appurtenances. The water main was constructed in a common trench with the wastewater extension and included a wastewater pumping station.

Photos

Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority

Contact Us Today!

Send Us a Message