Patton Municipal Authority, Cambria County
This six-contract project was undertaken to replace an existing surface water source with public supply wells, and to interconnect with the neighboring Elder Township Authority.
Design and construction services were provided for two-220 gallons per minute wells, a water treatment facility, a booster pumping station, a 125,000 gallon water storage tank, radio system controls, and 22,000 LF of water transmission main.
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District