Patton Municipal Authority Water System Improvements

Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Subdivision Plan
  • Design of Water Treatment and Pumping Facilities
  • Design of Storage, Distribution, and Transmission Design
  • Rate and Tap Fee Analysis
  • Well Development
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Patton Municipal Authority, Cambria County

Project Details

This six-contract project was undertaken to replace an existing surface water source with public supply wells, and to interconnect with the neighboring Elder Township Authority.

Design and construction services were provided for two-220 gallons per minute wells, a water treatment facility, a booster pumping station, a 125,000 gallon water storage tank, radio system controls, and 22,000 LF of water transmission main.

Photos

Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority