Falls Creek Borough – City of DuBois Water Interconnections

Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Storage, Distribution, and Transmission Design
  • Rate and Tap Fee Analysis
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Falls Creek Borough Municipal Authority, Clearfield County

Project Details

This project included the design and construction of a waterline interconnection with the City of Dubois. This 25,000 LF stretch of waterline provides the Municipal Authority with water directly from the City of Dubois. This enabled them to eliminate their Water Treatment Facilities and their surface water source. In addition, the project included communications upgrades to their existing water system which monitors tank levels, control booster station operation, and regulates the inflow of purchased water.

Photos

Keller Engineers is the easiest engineer that our Township has worked with. All their engineers and employees are really friendly and helpful. Karen Cregger, Secretary/Treasurer Southampton Township, Bedford County

Contact Us Today!

Send Us a Message