Falls Creek Borough Municipal Authority, Clearfield County
This project included the design and construction of a waterline interconnection with the City of Dubois. This 25,000 LF stretch of waterline provides the Municipal Authority with water directly from the City of Dubois. This enabled them to eliminate their Water Treatment Facilities and their surface water source. In addition, the project included communications upgrades to their existing water system which monitors tank levels, control booster station operation, and regulates the inflow of purchased water.
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District