Bedford Street Improvements

Responsibilities

  • Survey
  • Courthouse Research
  • Site Planning, Design, and Layout
  • Design of Demolition Plans
  • Design of Curbing, Sidewalk, and ADA compliant Curb Ramps
  • Erosion/Sedimentation Control Plans
  • Layout of Traffic Calming Measures
  • Construction Oversight

Owner

Hollidaysburg Borough, Blair County

Project Details

This project was undertaken in order to improve conditions and created a safe corridor for pedestrians, residents, and businesses along the 200, 300, and 400 blocks of Bedford Street. Design documents included replacement of deteriorated and non-ADA-compliant sidewalks, curbs, and curb ramps.

The corridor is primarily single-family homes; however, there are several commercial and civic buildings and a public park. Two speed tables were added to reduce vehicle speed and provide traffic calming measures to this busy street.

Photos

We have teamed with Keller Engineers on several design-build projects for PennDOT. When selecting a designer, the more critical factors are trust and competence, more so than a low price. If your designer makes a mistake in quantities it can cost you a lot of money. We have stayed with Keller Engineers because we trust them to provide competent service at a competitive price.  S. Scott Grannas, Vice President Grannas Bros. Stone & Asphalt Co., Inc.

Contact Us Today!

Send Us a Message