Huntingdon County
The project consisted of a superstructure replacement and widening of the bridge having three 57’-0” spans. The existing steel superstructure was removed and replaced with new steel I-beams and a concrete deck. The deck and all substructure units were widened to accommodate two traffic lanes. Total project length was 630’-0” including approach roadway and drainage facilities.
The bridge is located directly adjacent a church. Care was taken to minimize impact to the church and associated parking facilities. Additionally, the project included several environmental concerns. Stream disturbance was minimized to avoid impact to a species of concern.
I probably don’t say this enough, but we so appreciate the quality of work Keller Engineers does. The fact that they include building footprints and natural features makes these surveys super useful. I’m reminding my colleagues in other counties that their surveyors need to up their quality. F. Mark Schiavone, Executive Director Berkeley County Farmland Protection Board