Project Details

Keller Engineers was retained to provide engineering services necessary to demolish an abandoned facility and prepare the 2.1-acre site for future commercial development.  The project included an asbestos and lead-based paint report prepared by a sub-consultant. The structure had a concrete frame with concrete floor and roof framing. Concrete columns supported concrete beams and floor system.

Using an on-site mobile crushing operation, the concrete and brick materials from the building were used as fill.  The material was placed in the existing subgrade prior to the construction of a new facility.

[Brian Moore] has kept me informed every step of the way on the front lines of this project. With this being my first project and me still being on a huge learning curve, that speaks volumes about Keller Engineers and Brian’s commitment to your customers. Chuck Case, Manager Falls Creek Borough, Jefferson County