Parking Lot Replacement, Greater Allegheny Campus

Responsibilities

  • Survey
  • Site Planning, Design, and Layout
  • Design of ADA Compliant Curbs and Ramps
  • Parking Lot Design
  • Erosion/Sedimentation Control Plans
  • Stormwater Management

Owner

Pennsylvania State University, Blair County

Project Details

Keller Engineers replaced two existing parking lots on the Greater Allegheny campus of the Pennsylvania State University. Topographic survey and site assessment of the pavement and drainage piping to be replaced was performed. Keller staff prepared the design drawings and specifications for the replacement lots, including new storm inlets and piping.  The parking lot for the dormitory involved replacement of an existing set of stairs with a ramp for improved ADA accessibility into the dormitory and for ease of deliveries and “move-in/move-out” days.

During construction of the dormitory parking lot, the University requested design drawings and bid documents for the replacement of a parking lot/truck court for the campus maintenance building. Keller staff performed quick turnaround on the maintenance building drawings so the client could bid and construct the lot before paving season ended.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District

Contact Us Today!

Send Us a Message