Blue Course Medial Realty Associates, LP, Centre County
This new three-story, 48,000 SF medical building is designed as partial lease space and suites for Martin & Suhey Orthopedics. Keller Engineers team was responsible for the site and structural engineering.
The partial underground first floor is constructed of large retaining walls, light gauge metal stud infilling, and a steel frame which supports the second and third floors. The roof structure is a pitched roof of metal trusses.
Site work on this 6.7-acre lot included design, utilities, access driveway, lighting, landscaping, and a parking lot with 250 parking stalls.
Keller Engineers has been an extremely valuable asset for us in the development/construction of our store sites by providing accurate and timely structural and site development drawings and answers to related questions. Their response and turn-around time to the Sheetz Store Development Department has been outstanding. We have no hesitation in turning to Keller Engineers for our store structural and site development needs. Joe S. Sheetz, Executive Vice President, Finance & Store Development Sheetz Corporation