Fulton County Medical Center, Fulton County
This project included the construction of a 17,600 SF Patient Services and Administration building that consolidated six hospital ancillary sites into one building on the medical campus. Site work on this included design and construction of a new 80-stall parking lot, two bio-retention basins, erosion and sedimentation control measures, landscaping, and ADA compliance walkways.
Project Uniqueness/Challenges:
Keller Engineers’ Structural Division was responsible for the design of all structural elements. The building has a steel frame with conventional concrete foundations.
[The] entire staff did a wonderful job! We truly appreciate all the hard work in making our bridge project a success and something we can be very proud to have in our township. Bev Sherwood Burns, Supervisor Blacklick Township