Fulton County Medical Center, Fulton County
This project included the construction of a 17,600 SF Patient Services and Administration building that consolidated six hospital ancillary sites into one building on the medical campus. Site work on this included design and construction of a new 80-stall parking lot, two bio-retention basins, erosion and sedimentation control measures, landscaping, and ADA compliance walkways.
Project Uniqueness/Challenges:
Keller Engineers’ Structural Division was responsible for the design of all structural elements. The building has a steel frame with conventional concrete foundations.
Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority