Juniata River Access Project

Responsibilities

  • Survey
  • Design and Detailing of Concrete, Steel, Masonry and Wood Structures
  • Site Planning, Design, and Layout
  • Landscape Architecture
  • Recreational Site/Facility Design
  • General and Joint Permits
  • Erosion/Sedimentation Control Plans
  • Floodplain Investigations
  • Wetland Investigations, Delineation, and Mitigation Plans
  • Environmental/Waterway Permitting

Owner

Mount Union Borough and Mapleton Borough, Huntingdon County

Project Details

This project included the design of access launches to the Juniata River in both Mapleton and Mount Union, Huntingdon County, PA.

Both sites include kayak/canoe launch platforms, new gravel parking lots, canoe storage, and campsites for primitive overnight camping.

Unique elements per location:

  • Mapleton Site includes : wooden canoe/kayak launch platform, wooden ADA accessible fishing platform, Adirondack shelter, canoe/kayak storage rack with locker storage underneath, and a vault comfort station.
  • Mount Union Site includes: an asphalt roadway to the river, a concrete boat launch platform into the river, wooden canoe/kayak launch platform, canoe/kayak storage rack with locker storage underneath.

Project Uniqueness/Challenges:

  • Our client, Allegheny Ridge Corporation, coordinated both projects for the Boroughs. Both projects are part of the Juniata River Water Trail.
  • Team designed/detailed unique elements such as wooden canoe/kayak launch platform, wooden ADA accessible fishing platform at Mapleton, wooden Adirondack shelter, canoe/kayak storage rack with locker storage underneath, concrete boat launch at Mount Union, and campsites
  • Due to the amount of grading in the floodway, Mount Union needed a Joint Permit to create the boat launch.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District

Contact Us Today!

Send Us a Message