Rails to Trails of Central PA

Responsibilities

  • Field Survey
  • Permitting
  • Design
  • Construction Drawings
  • Construction Plans
  • Construction Inspection
  • Bid Documents and bidding
  • Acquisition of Agency Approvals

Owner

Rails to Trails

Project Details

Keller Engineers has completed several projects on the Lower Trail for Rails to Trails/Allegheny Ridge Corporation.   The Lower Trail is a rail trail located on the former Petersburg Branch of the Pennsylvania Railroad along the Frankstown Branch of the Juniata River.

Project highlights include:

  • Eleven-mile Lower Trail Gap Study
  • Four trailside restroom comfort stations
  • SR 9900 – Improvements to section low
  • Improvements to Norfolk Southern Trail section
  • Stream bank stabilization improvements
  • Re-decking of Mt. Etna Bridge
  • Lower Trail Floodwall
  • Miscellaneous trail improvements

Photos

Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority

Contact Us Today!

Send Us a Message