Memorial Spray Park

Responsibilities

  • Survey
  • Base Mapping
  • Site Planning, Design, and Layout
  • Recreational Site/Facility Design
  • Utility Coordination
  • Erosion/Sedimentation Control Plans
  • Stormwater Management, Analysis, and Design
  • Permitting

Owner

City of Altoona and Central Recreation and Park Commission, Blair County

Project Details

This project included the demolition and filling of the existing Memorial Pool to construct an at grade water park.  This new spray park was noted by RainDrop, Inc., equipment provider, as one of the largest of its kind on the east coast.

The new park includes shaded perimeter seating, along with the construction of a new pavilion and the renovation of an existing pavilion.  Additionally, the project involved design and construction of a 3,600 SF playground, resurfacing of an existing basketball court, a pavilion, ADA accessibility, and parking.

Project Uniqueness/Challenges: Coordination of specialized equipment, plumbing and electrical systems, and retrofitting of the existing mechanical room.

Photos

We have teamed with Keller Engineers on several design-build projects for PennDOT. When selecting a designer, the more critical factors are trust and competence, more so than a low price. If your designer makes a mistake in quantities it can cost you a lot of money. We have stayed with Keller Engineers because we trust them to provide competent service at a competitive price.  S. Scott Grannas, Vice President Grannas Bros. Stone & Asphalt Co., Inc.

Contact Us Today!

Send Us a Message