Memorial Spray Park

Responsibilities

  • Survey
  • Base Mapping
  • Site Planning, Design, and Layout
  • Recreational Site/Facility Design
  • Utility Coordination
  • Erosion/Sedimentation Control Plans
  • Stormwater Management, Analysis, and Design
  • Permitting

Owner

City of Altoona and Central Recreation and Park Commission, Blair County

Project Details

This project included the demolition and filling of the existing Memorial Pool to construct an at grade water park.  This new spray park was noted by RainDrop, Inc., equipment provider, as one of the largest of its kind on the east coast.

The new park includes shaded perimeter seating, along with the construction of a new pavilion and the renovation of an existing pavilion.  Additionally, the project involved design and construction of a 3,600 SF playground, resurfacing of an existing basketball court, a pavilion, ADA accessibility, and parking.

Project Uniqueness/Challenges: Coordination of specialized equipment, plumbing and electrical systems, and retrofitting of the existing mechanical room.

Photos

We are very proud of our new office addition. Keller Engineers provided excellent guidance and support throughout our building project, which included key elements such as: structural recommendations, land development, environmental planning, and a beautiful rain garden. We knew we could trust the expertise of Adam Long, RLA and Brian Smith, PE in helping us create a practical and beautiful building and streetscape that enhances our neighborhood and the community. Dr. Alice Plummer Joyce, Altoona Dermatology Associates

Contact Us Today!

Send Us a Message