Allegheny Lutheran Social Ministries, Blair County
The project involved construction of 28 mixed single and duplex residential townhouse units, a 3,600 SF community center with recreation areas, and associated stormwater management areas and utility extensions along a boulevard section of private roadway. The project also included the relocation and replacement of an existing 15’ sanitary sewer main and 12’ water main.
Because of the water and wastewater aspects, coordination of sanitary sewer main relocation with Frankstown Township and water main relocation with Hollidaysburg Borough was necessary. Storm tank modules for underground stormwater detention within the primary bio retention area were used.
I probably don’t say this enough, but we so appreciate the quality of work Keller Engineers does. The fact that they include building footprints and natural features makes these surveys super useful. I’m reminding my colleagues in other counties that their surveyors need to up their quality. F. Mark Schiavone, Executive Director Berkeley County Farmland Protection Board