ALSM Cottages – Blairmont

Responsibilities

  • Survey
  • Mapping Control
  • Base Mapping
  • FEMA Flood Elevation
  • Subdivision Plan
  • Site Planning, Design, and Layout
  • Landscape Plan
  • Highway Occupancy Permits
  • Utility Coordination
  • Sewage Facilities Planning
  • Erosion/Sedimentation Control Plans
  • NPDES Permitting
  • Stormwater Management, Analysis, Design, and Permitting
  • Floodplain Investigations
  • Wetland Investigations, Delineation, and Mitigation Plans

Owner

Allegheny Lutheran Social Ministries, Blair County

Project Details

The project involved construction of 28 mixed single and duplex residential townhouse units, a 3,600 SF community center with recreation areas, and associated stormwater management areas and utility extensions along a boulevard section of private roadway.  The project also included the relocation and replacement of an existing 15’ sanitary sewer main and 12’ water main.

Because of the water and wastewater aspects, coordination of sanitary sewer main relocation with Frankstown Township and water main relocation with Hollidaysburg Borough was necessary.  Storm tank modules for underground stormwater detention within the primary bio retention area were used.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District