Gatesburg Road Development, Blair County
The project was a partial renovation and new construction addition to a significant historic property that had been vacant for 15 years. The original wings of the building had to be demolished, but the core with its cupola was saved and restored. The additions were designed to emulate the original wings of the building. The 4-story building was converted into 53 senior apartments with community rooms.
Project Challenges/Uniqueness:
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District