Allegheny Portage Railroad 6 to 10 Trail

Responsibilities

  • Boundary Survey
  • Topographic Survey
  • Construction Stakeout Survey
  • NPDES Stormwater Construction Permit
  • Erosion and Sedimentation Plan

Owner

National Park Service, Cambria County

Project Details

Keller Engineers provided the following survey services for a National Park Service project. Additionally, during the multiple stages of this project, the survey team resolved a property dispute that surfaced.

  • Boundary survey for a 100-acre tract of National Park Service property
  • Location and survey of the 10-mile Wilderness Trail corridor from Summit Level to Foot-of-Ten
  • Boundary survey for various parking areas, rest areas, along the old Portage Railroad bed, and interpretation areas.
  • Highway Occupancy topographic surveys for three crossings (safety factors)
  • Construction survey and handicapped accessibility survey in selected areas.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District

Contact Us Today!

Send Us a Message