Fox Township Supervisors, Elk County
The project included the survey and design to extend the existing roadway, 2,224’ of 6″ PVC water main, and 1,663’ of 8″ PVC sewer main within the 32-acre industrial park. Drainage improvements were addressed with the design and construction of a sedimentation basin/detention facility with conveyance ditches and piping.
Two acid mine discharges existed on the site at the beginning of the design. A passive treatment facility was designed to treat the water from its source. This passive facility also served as a mitigation technique to remove jurisdictional wetlands from within the buildable area of the lots.
[The] entire staff did a wonderful job! We truly appreciate all the hard work in making our bridge project a success and something we can be very proud to have in our township. Bev Sherwood Burns, Supervisor Blacklick Township