PA Army National Guard / PA Department of General Services / Department of Military and Veterans Affairs
This project included construction of new Readiness Center/Armory on 12 acres of Department of Military and Veteran’s Affairs (DMVA) land.
Phase 1 included a schematic design/engineering. Phase 2 – site design and construction documents – was awarded to Keller Engineers as part of a Design-Build Contract.
The Design-Build contract included design that evolved as construction documents were being finished through negotiations with the DMVA and negotiations with adjacent property owner to obtain easements for connection to sanitary sewer and potable water supply.
I probably don’t say this enough, but we so appreciate the quality of work Keller Engineers does. The fact that they include building footprints and natural features makes these surveys super useful. I’m reminding my colleagues in other counties that their surveyors need to up their quality. F. Mark Schiavone, Executive Director Berkeley County Farmland Protection Board