Stryker Brigade – Huntingdon

Responsibilities

  • Survey
  • Site Planning, Design, and Layout - Accommodating design and detail revisions
  • Accommodating DGS Plan Revisions, Procedures, and Review Process
  • Accommodating Design Details for Security, Anti-Terrorist/Force Protection Measures
  • Obtaining Municipal Approvals
  • Utility Coordination
  • Construction Drawings
  • Construction Inspection

Owner

PA Army National Guard / PA Department of General Services / Department of Military and Veterans Affairs

Project Details

This project included construction of new Readiness Center/Armory on 12 acres of Department of Military and Veteran’s Affairs (DMVA) land.

Phase 1 included a schematic design/engineering.  Phase 2 – site design and construction documents – was awarded to Keller Engineers as part of a Design-Build Contract.

The Design-Build contract included design that evolved as construction documents were being finished through negotiations with the DMVA and negotiations with adjacent property owner to obtain easements for connection to sanitary sewer and potable water supply.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District