Stryker Brigade Fire Protection Storage Tank

Responsibilities

  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Design of Water Treatment and Pumping Facilities
  • Design of Storage, Distribution, and Transmission
  • Bidding Services
  • Construction Administration
  • Permitting

Owner

Pennsylvania Department of General Services, Huntingdon County

Project Details

This project included the design and construction of a 71,000 gallon water storage tank and fire pump emergency generator control system to provide fire protection to the Department of General Services’ Huntingdon Readiness Center complex.

Project Uniqueness/Challenges:  Due to the potential for standing water to freeze during the winter months, spray foam insulation was applied to the exterior of the tank following construction.

Photos

We have teamed with Keller Engineers on several design-build projects for PennDOT. When selecting a designer, the more critical factors are trust and competence, more so than a low price. If your designer makes a mistake in quantities it can cost you a lot of money. We have stayed with Keller Engineers because we trust them to provide competent service at a competitive price.  S. Scott Grannas, Vice President Grannas Bros. Stone & Asphalt Co., Inc.