Red Mill Water and Wastewater System

Responsibilities

  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Design of Water Treatment and Pumping Facilities
  • Design of Storage, Distribution, and Transmission
  • Rate and Tap Fee Analysis
  • Permitting
  • Construction Inspection and Management
  • Grant and Funding Applications
  • Design of Wastewater Collection and Pumping Facilities
  • Bidding Services
  • Act 537 Plans

Owner

Falls Creek Borough Municipal Authority, Jefferson County

Project Details

This project included the design of a 22,000 LF water system expansion, a 19,000 LF wastewater extension, water storage facility, booster pumping facilities, water treatment plant modification, a computerized treatment process control system, and related appurtenances. The water main was constructed in a common trench with the wastewater extension and included a wastewater pumping station.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District