Memorial Spray Park

Responsibilities

  • Survey
  • Base Mapping
  • Site Planning, Design, and Layout
  • Recreational Site/Facility Design
  • Utility Coordination
  • Erosion/Sedimentation Control Plans
  • Stormwater Management, Analysis, and Design
  • Permitting

Owner

City of Altoona and Central Recreation and Park Commission, Blair County

Project Details

This project included the demolition and filling of the existing Memorial Pool to construct an at grade water park.  This new spray park was noted by RainDrop, Inc., equipment provider, as one of the largest of its kind on the east coast.

The new park includes shaded perimeter seating, along with the construction of a new pavilion and the renovation of an existing pavilion.  Additionally, the project involved design and construction of a 3,600 SF playground, resurfacing of an existing basketball court, a pavilion, ADA accessibility, and parking.

Project Uniqueness/Challenges: Coordination of specialized equipment, plumbing and electrical systems, and retrofitting of the existing mechanical room.

Photos

Keller Engineers has been an extremely valuable asset for us in the development/construction of our store sites by providing accurate and timely structural and site development drawings and answers to related questions.  Their response and turn-around time to the Sheetz Store Development Department has been outstanding. We have no hesitation in turning to Keller Engineers for our store structural and site development needs. Joe S. Sheetz, Executive Vice President, Finance & Store Development Sheetz Corporation

Contact Us Today!

Send Us a Message