Mastery Pyne Poynt High School
Keller Engineers completed the 3rd party inspection services for the conversion of an existing 1960’s era middle school into a 105,000 SF state-of-the-art, technology-enriched high school for Mastery Charter Schools.
Site improvements included demolition, grading, earthwork, placement of subgrade, DGA subbase, WMA and HMA pavement, stormwater management, construction of curbing and sidewalk in the parking lot, building access and perimeter, ADA compliant handicap curbs and ramps, hardscaping with brick pavers (for bus turnaround) and landscaping. Other site features included the construction of two rain gardens, handling of contaminated onsite materials, placement of pervious concrete pads and paving using GPS grading.
It is my pleasure and honor to acknowledge the relationship that Remington & Vernick Engineers, Inc. has developed with Keller Engineers of New Jersey, LLC. I’d like to share one experience that RVE has had with Keller regarding our Camden City ADA Ramp Improvement Project. The inspector was well versed in various areas of construction. The attention to detail that he demonstrated on as-builts, and recordkeeping were excellent, and he was very knowledgeable with meeting all ADA requirements. He developed a great working relationship with both our resident inspector and construction manager, which alleviated many forms of miscommunication which may occur in the field. Joseph R. Ragusa, PE Senior Associate Department Head Infrastructure CM/CI Remmington & Vernick Engineers, Inc.