Lung Disease Center for Central Pennsylvania, Blair County
The site, located in downtown Altoona, was covered by 100% impervious surface. Keller Engineers explored multiple design options to minimize variances needed for a difficult zoning district. The final site design reduced construction costs by utilizing an asphalt overlay of an existing parking lot for more than half the new parking spaces.
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District