Juniata River Access Project

Responsibilities

  • Survey
  • Design and Detailing of Concrete, Steel, Masonry and Wood Structures
  • Site Planning, Design, and Layout
  • Landscape Architecture
  • Recreational Site/Facility Design
  • General and Joint Permits
  • Erosion/Sedimentation Control Plans
  • Floodplain Investigations
  • Wetland Investigations, Delineation, and Mitigation Plans
  • Environmental/Waterway Permitting

Owner

Mount Union Borough and Mapleton Borough, Huntingdon County

Project Details

This project included the design of access launches to the Juniata River in both Mapleton and Mount Union, Huntingdon County, PA.

Both sites include kayak/canoe launch platforms, new gravel parking lots, canoe storage, and campsites for primitive overnight camping.

Unique elements per location:

  • Mapleton Site includes : wooden canoe/kayak launch platform, wooden ADA accessible fishing platform, Adirondack shelter, canoe/kayak storage rack with locker storage underneath, and a vault comfort station.
  • Mount Union Site includes: an asphalt roadway to the river, a concrete boat launch platform into the river, wooden canoe/kayak launch platform, canoe/kayak storage rack with locker storage underneath.

Project Uniqueness/Challenges:

  • Our client, Allegheny Ridge Corporation, coordinated both projects for the Boroughs. Both projects are part of the Juniata River Water Trail.
  • Team designed/detailed unique elements such as wooden canoe/kayak launch platform, wooden ADA accessible fishing platform at Mapleton, wooden Adirondack shelter, canoe/kayak storage rack with locker storage underneath, concrete boat launch at Mount Union, and campsites
  • Due to the amount of grading in the floodway, Mount Union needed a Joint Permit to create the boat launch.

Photos

Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority

Contact Us Today!

Send Us a Message