JETSA – Fords Corner and New Municipal Building

Responsibilities

  • Survey
  • Grant and Funding Applications
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Subdivision Plan
  • Design of Wastewater Collection and Pumping Facilities
  • Design of ADA compliant sidewalks, curb ramps, and parking facilities
  • Act 537 Plans
  • Rate and Tap Fee Analysis
  • Land Planning Modules
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Jackson East Taylor Sewer Authority, Cambria County

Project Details

Wastewater Extension: This project involved construction of approximately 19,500 LF of 8” and 6” PVC wastewater main and 2,716 LF of 4” PVC force main, manholes, related appurtenances, and restoration.

The Pump Station project included the construction of two new pump stations, reconstruction of the existing Pump Station #12, and replacement of pumps at the existing Pump Stations #3 and #7, along with related appurtenances and restoration. The information will be entered into the Authority’s existing GIS system.

Municipal Building: This project included demolition of the existing office, utility relocation, a new 1,400 SF office building, design of an ADA concrete sidewalk and parking lot, new signage and two defined entrance/exit locations onto the state road.

Photos

We have worked with Keller Engineers for structural and civil engineering support on six projects over the past five years and have been very pleased with the results. Our projects tend to be complicated phased renovation/ addition projects calling for creativity in planning and construction.  I have been particularity pleased with their responsiveness to issues that arise during construction which is of particular importance to us and our clients. Vern L. McKissick, III, AIA, LEED AP, Owner/Architect McKissick Associates