Greendown Acres Mobile Home Park Wastewater System

Responsibilities

  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Design of Wastewater Collection and Pumping Facilities
  • Replacing 96 mobile home laterals and reconnections
  • Infiltration/Inflow Analysis
  • Observation Ports
  • Permitting
  • Bidding Services
  • Construction Inspection and Management
  • Grant and Funding Applications

Owner

Blair Township Water and Sewer Authority, Blair County

Project Details

This project included the replacement of 2,800 LF of 8” PVC wastewater main, manholes, laterals, observation ports, and vents/cleanouts/traps; as well as the replacement of 96 mobile home laterals and reconnections, connection to existing wastewater system, related appurtenances and restoration. Keller Engineers’ team provided survey, design, bid process, and construction inspection/oversight.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District