Gardner Denver Company – New Manufacturing Facility

Responsibilities

  • Survey
  • Site Planning, Design, and Layout
  • Parking Lot Design
  • Permitting
  • Stormwater Management
  • Erosion Control
  • Landscape Plan
  • Lighting Plan
  • Utility Design
  • Land Development Approvals
  • Construction Documents
  • Lot Merge Plan

Owner

Original Owner: Gardner Denver Company | Purchased by DelGrosso Foods in 2021

Project Details

This project included the design of a 70,400 SF manufacturing and office space, parking for 110 cars, truck docks, and a maneuver area. The design allows for future expansion.

Project Uniqueness/Challenges:

  • Numerous grading options for balance earthwork
  • Incredibly aggressive schedule to meet contracted building occupancy date
  • Numerous wetland pockets at perimeter of site
  • Coordination with electric company for off-site extension due to high electric demand in facility

Photos

Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority