East Conemaugh Borough, Cambria County
The age, inaccessibility, and materials of construction of the Borough’s combined system made repair/separation impossible. Tests determined that the most cost-effective option was to install a new separate wastewater system.
Keller Engineers’ team designed a new 30,000 LF wastewater collection system. Laterals were extended to within 4’ of the structure to be served. The Borough’s existing combined storm/sewer system remained a stormwater system.
Keller Engineers has been an extremely valuable asset for us in the development/construction of our store sites by providing accurate and timely structural and site development drawings and answers to related questions. Their response and turn-around time to the Sheetz Store Development Department has been outstanding. We have no hesitation in turning to Keller Engineers for our store structural and site development needs. Joe S. Sheetz, Executive Vice President, Finance & Store Development Sheetz Corporation