East Conemaugh Borough, Cambria County
The age, inaccessibility, and materials of construction of the Borough’s combined system made repair/separation impossible. Tests determined that the most cost-effective option was to install a new separate wastewater system.
Keller Engineers’ team designed a new 30,000 LF wastewater collection system. Laterals were extended to within 4’ of the structure to be served. The Borough’s existing combined storm/sewer system remained a stormwater system.
[Brian Moore] has kept me informed every step of the way on the front lines of this project. With this being my first project and me still being on a huge learning curve, that speaks volumes about Keller Engineers and Brian’s commitment to your customers. Chuck Case, Manager Falls Creek Borough, Jefferson County