CURRENTLY IN DESIGN – New Bus Facility

Responsibilities

  • Survey
  • Base Plan
  • Conceptual Plans
  • Traffic Study
  • Comprehensive Site Development Design
  • Permitting
  • Construction Drawings
  • Design of Parking Lot
  • Landscape Plan
  • Site Lighting Plan
  • Stormwater Management
  • Erosion and Sediment Control
  • Service Laterals
  • Coordination with Project Stakeholders and Sub-consultants
  • Preparation and Submission of Municipal Applications

Owner

Maytav Bus Company, Inc | Camden County, NJ

Project Details

The project includes the construction of a 9,100 SF bus maintenance building, renovation of an existing building, and construction of a parking facility for buses, minivans, and cars. The 1.816 site is presently 100% impervious from a previous use.

Site improvements include one ingress and two egress driveways onto Pine Street, construction of a new 50’ x 70’ three bay bus maintenance facility, renovation of a two-story brick building into offices and a driver’s lounge, parking for 54 buses, 28 minivans, and 11 cars, and utility connections.

Photos

We have been working with Keller Engineers of New Jersey and have found the firm to exhibit the highest quality of professional engineering. They are exceptionally responsive, supportive, and versatile in all aspects of engineering. The staff is well trained and educated in the forefront of technology. Keller Engineers takes both responsibility and pride in satisfying their customers of which we are grateful to be included. Joe Myers Chief Operating Officer Camden Community Partnership

Contact Us Today!

Send Us a Message